01952 928118 info@lkpconstructionltd.co.uk TELFORD · SHROPSHIRE / MON TO FRI 08:00–18:00

Home / Projects

Who turns up, and what they leave behind.

LKP works in named crews. Cable investigation, track and box, fibre, foundations, reinstating. This page is their work, grouped the way the company is actually organised.

26 PHOTOGRAPHS / 7 CREWS ALL TAKEN ON LKP SITES TELFORD, SHROPSHIRE

What you can check.

Six things on this page you can test without taking our word for anything. Four are sitting inside a photograph, and the link drops you on the frame that shows it. Two are on LKP’s own published service list and are labelled that way, because we are not going to describe a photograph that does not exist.

  1. 01 Night work on a trunk road verge, lighting tower up and lane barriers out. JUNCTION SIGN IN SHOT / COVENTRY M69 / LEICESTER A5460 In frame
  2. 02 Duct depth proved against a tape and a straight edge before anything was backfilled. TAPE DOWN THE TRENCH SIDE / STRAIGHT EDGE ACROSS THE TOP In frame
  3. 03 HV and MV cable from transformers to substations, then terminations, jointing and testing. LKP SERVICE LIST / POWER CABLING, AC SIDE / PHOTOGRAPHED AS DRUMS AND COMPOUND, NOT AS A MADE JOINT On his list
  4. 04 Fibre carried as four separate disciplines, not one: testing, splicing, blowing and cabling. FOUR SEPARATE LINES ON HIS LIST / IN SHOT, YELLOW FIBRE FED INTO PURPLE DUCT ENTRIES In frame
  5. 05 Deep foundations: driven piles, bored piles and micro-piles. LKP SERVICE LIST / DEEP FOUNDATIONS / THE FOUNDATION SHOTS HERE ARE STRIP, PAD AND PIT WORK On his list
  6. 06 Concrete floated off, and chamber covers set flush to finished level. ONE FRAME, FLOAT AND SHUTTERING STILL UP / THE NEXT, COVER FLUSH IN ITS SURROUND In frame

That is what the photographs carry, and it is not the whole job. Two more lists follow: the five third-party checks a buyer should make us prove, each one blank until we can print a number in it, and then the public register entry for the company itself, every line linked to the Companies House page it was read from.

How to read this page

  • Every photograph here was taken on an LKP site. Nothing on this page is a render, a stock library picture or a photograph of somebody else’s job.
  • Captions describe what is in the frame, and stop there. No project names, no client names, no contract values. If a caption does not say where it is, that is because the photograph does not.
  • Where there is no photograph, we say so. One of the crews below works entirely before the ground opens. It gets a schematic and its method, not a borrowed image.

STA 01 / 07

Cable Investigation Team, and the Blockage Crew

Two of the crews LKP names do their work before anything is dug, or when a cable has already failed. Neither leaves much to photograph, so this page gives you the method instead of a picture.

Cable Investigation Team
Survey and verification of underground cable routes before excavation.
Use of detection tools (for example cable locators, ground-penetrating radar) to avoid damage.
Damaged cable investigation
Damaged cable investigation works. Replacing damaged power cables, and jointing.
Blockage Crew (civil support for cables)
Specialised team to identify and clear obstructions in underground ducts and trenches.
Ensures smooth cable pulling and prevents delays in installation.
Schematic of a pre-dig cable survey A drawing, not a photograph. A detection unit sits on the surface and sweeps downward, finding a pair of ducts buried under the setting-out line before the ground is opened. SCHEMATIC NOT A PHOTOGRAPH SURFACE EXISTING SERVICE SETTING OUT
A drawing, not a photograph. The survey happens before the ground opens, so there is nothing on site to photograph yet. We would rather show you the method than borrow a picture of somebody else’s.

STA 02 / 07

Track and Box Construction

The trench is the track, the chamber is the box. This is the crew that opens the route, protects it, and leaves something a cabling team can actually pull through.

Track construction
Excavation and preparation of trenches (tracks) for cabling routes.
Box construction
Installation of protective ducting, cable boxes, and chambers for power and fibre cabling.

STA 03 / 07

Site preparation, power cabling and DC cabling

On the energy sites the same crew builds the ground the kit stands on and then pulls the cable that connects it.

Earthworks and site preparation
Land clearing, grading, and compaction for panel mounting areas.
Construction of access roads, drainage systems, and stormwater control.
Power cabling (AC side)
Supply and installation of high-voltage (HV) and medium-voltage (MV) cables from transformers to substations.
Terminations, jointing, and testing of all power circuits.
Winch works.
DC cabling (PV strings)
Installation of DC cabling connecting solar panels to combiner boxes and inverters.
Proper routing, fixing, and protection to ensure efficiency and minimise losses.
Winch works.
Concrete pillar and foundation works
Construction of reinforced concrete foundations or pillars for solar panel structures.
Precision setting to ensure stability and alignment of mounting systems.

STA 04 / 07

Fibre Optic Cabling (Communication and SCADA)

The thin cable that makes an energy site controllable. Luke lists fibre as four separate lines of work, not one.

Fibre optic cabling
Laying and splicing of fibre optic cables for data transfer, monitoring, and remote operation.
Integration with SCADA systems for real-time performance tracking.
Listed separately by LKP
Fibre testing. Fibre splicing. Fibre blowing. Fibre cabling.

STA 05 / 07

Foundations and substructures

The housing side of the business, from clearing the plot to the reinforcement going down. Most of these photographs are the same job at different stages.

Site preparation and earthworks
Clearing and grubbing: removal of vegetation, debris, and unsuitable material.
Excavation and filling: bulk excavation, trenching, foundation pits.
Grading and compaction: preparing level platforms for buildings, roads, or slabs.
Temporary works: access roads, site drainage, fencing, and hoarding.
Shallow foundations
Pad footings, strip footings, rafts.
Deep foundations
Driven piles, bored piles, micro-piles.
Basements and retaining structures
Diaphragm walls, soldier piles, ground anchors.
Concrete works
Blinding layers, pile caps, ground beams.
Formwork and shuttering: safe and accurate casting systems.
Concrete pouring and finishing: vibration, curing, surface finishing.
Special concrete works: waterproof concrete, fibre-reinforced, high-strength grades.

STA 06 / 07

Reinstating crew, and finishing works

The part a client actually sees when the job is done. LKP names reinstatement as its own crew, sitting inside a longer finishing-works list.

Finishing works
Front end works. Roads and sewers. Remedial work. Tarmaccing works.
Signage and lighting works. Reinstating crew. Services exposing. Land drains.
Concrete finishing
Concrete pouring and finishing: vibration, curing, surface finishing.

STA 07 / 07

Highways: roadside and safety features

Several of these were taken after dark, under lighting towers and behind barriers. The tape in the last one says what is going in.

Roadside and safety features
Road kerbs, medians, and shoulders.
Guardrails, crash barriers, and parapets.
Road signage, line marking, and cat’s eyes.
Street lighting and electrical ducting.
Site preparation and earthworks
Clearing, grubbing, and removal of unsuitable materials.
Excavation, embankment formation, and soil stabilisation.
Subgrade preparation and compaction.
Temporary works: access roads, haul routes, and site drainage.
Ancillary civil works
Utility crossings: water pipelines, telecom, electrical ducts.
Service roads, rest areas, and parking bays.
Landscaping and slope stabilisation along highways.

What you should make us prove.

Everything above this line is either a photograph or a public register entry. Between them they show the work is real and the company is real. Neither one tells you who has hired us, or what stands behind a crew when a job goes wrong. Those answers are held by third parties, and we do not publish any of them today. So instead of a wall of badges, here is the list itself: what each one would prove, the exact thing to ask for, and how to check the answer without taking our word for it.

5 CHECKS LISTED 0 SUPPLIED SO FAR 0 BADGES SHOWN
  1. 01

    Not published

    SSIP or CHAS registration

    SSIP is Safety Schemes in Procurement, and CHAS is one of its member schemes. A registration proves an independent assessor has been through our health and safety management rather than us calling it sound. On a lot of principal contractor and local authority frameworks this is the gate that decides whether anybody reads the rest of a bid.

    Ask for
    The scheme name, the registration number, and the expiry date.
    Check it against
    The issuing scheme’s own member register. A badge on a website is a picture; a number on a register is a record.

    Registration no.Not supplied

    CHECKED 09 SEP 2026 / NO SCHEME NAME, NUMBER OR BADGE APPEARS ON ANY PAGE OF LKPCONSTRUCTIONLTD.CO.UK

  2. 02

    Not published

    Constructionline membership

    Proves the standard prequalification pack, insurance, finances, health and safety, policies, has been submitted once and verified by somebody other than us, so a buyer does not have to assess it from scratch. It is the single fastest way for a procurement team to clear a subcontractor.

    Ask for
    The membership number and the level held: Bronze, Silver, Gold or Platinum.
    Check it against
    Your own Constructionline account. A buyer with a login can pull the record directly instead of accepting a certificate by email.

    Membership no.Not supplied

    CHECKED 09 SEP 2026 / NO MEMBERSHIP NUMBER OR LEVEL IS PUBLISHED BY LKP ANYWHERE

  3. 03

    Not published

    Public liability insurance

    This is the one that exposes you rather than us. If a bucket goes through a live service, or a third party’s property is damaged on a job we are running, the cover behind the crew is what settles it. Photograph 02 in the index at the top of this page shows a duct being proved to depth before backfill, which is the practice; the policy is the backstop for the day the practice is not enough.

    Ask for
    The insurer, the limit of indemnity, the policy number and the renewal date, on the certificate itself rather than typed into an email.
    Check it against
    The dates. A certificate is only worth the period it covers, so match the renewal date to the weeks you expect us on site.

    Insurer and limitNot supplied

    CHECKED 09 SEP 2026 / NO INSURER, LIMIT OR POLICY NUMBER IS PUBLISHED BY LKP ANYWHERE

  4. 04

    Not published

    NRSWA street works cards

    Proves the operatives and the supervisor opening a public highway are qualified to open it. This one is not abstract on this page: several of the photographs above are night work on a public road verge, behind barriers, under a lighting tower, and that is precisely the work these cards govern.

    Ask for
    Which units are held and by how many of the crew. Operative units run O1 to O8, supervisor units S1 to S6, and the split matters more than the headcount.
    Check it against
    The cards themselves. Each carries a registration number and an expiry date, and the holder’s record sits on the national street works qualifications register.

    Units heldNot supplied

    CHECKED 09 SEP 2026 / NO CARD, UNIT OR REGISTRATION IS PUBLISHED BY LKP ANYWHERE

  5. 05

    Not published

    One client, scheme or reference we are allowed to name

    The photographs prove the work happened. They do not prove anyone bought it. One name, with permission, closes that gap harder than the next ten photographs would. The closest thing on this page is the junction sign in photograph 01, which puts a crew on a public trunk road after dark. It does not say who instructed the work, and we are not going to guess in public.

    Ask for
    Written permission to name one client or one scheme. Failing that, the council area and the sector of one job, plus somebody who will take a reference call.
    Check it against
    The phone. Ring the contact. It is the only check on this list that no document can fake.

    Named referenceNot supplied

    CHECKED 09 SEP 2026 / NO CLIENT, SCHEME OR CONTRACT IS NAMED ON LKPCONSTRUCTIONLTD.CO.UK, AND NONE IS NAMED HERE

Five rows, five blanks. That is the honest state of it, and it is printed rather than quietly left out, because a buyer finds this out anyway, usually halfway through prequalification, and finding out then costs everybody a fortnight. When a number arrives it goes in the row it belongs to, with the body that issued it and the date it runs out, and that row stops saying not published. Until then this page claims nothing on any of the five, and the only credentials it shows you are the ones on the public register below.

Ask us for all five in writing

5 ROWS OPEN / 0 CLOSED / LAST CHECKED 09 SEP 2026

Who you would actually be contracting with.

Photographs get LKP a conversation. This is the part that gets LKP past procurement. Every line below is held on the public register by Companies House rather than written by us, and every line links to the page it was read from, so the whole panel can be checked in about a minute.

On the Companies House register LKP Construction Ltd Company no. 14482663 Active, private limited company Open the register entry
Incorporated
14 November 2022
The same 2022 start date LKP gives on its own about page. Just under four years on the register, and said plainly.
Check on Companies House, incorporation date
Registered office
Conwy House, Suite 1, Telford, Shropshire, TF2 7BF
Change of address filed 16 April 2026. Telford, Shropshire, which is the base LKP publishes on its own site.
Check on Companies House, registered office
Director
Luke Pritchard, appointed 14 November 2022
One officer on the register and no resignations since incorporation. The Managing Director named on LKP’s about page is the director named on the register.
Check on Companies House, director appointment
Who controls it
Luke Pritchard and Reece Pritchard
Both recorded as people with significant control, each holding more than 25% and not more than 50% of the shares, notified 14 November 2022 and 6 April 2023. LKP’s about page names Reece Pritchard as Secretary; the register lists no company secretary, so we have not called her one here.
Check on Companies House, people with significant control
Registered activity
42990 Construction of other civil engineering projects
Filed alongside 43210 electrical installation, 41100 development of building projects and 41202 construction of domestic buildings. Four codes the company chose itself, and they line up with the ducting, cabling and groundworks in the photographs above.
Check on Companies House, registered activity codes
Accounts
Filed to 5 April 2025
Micro company accounts, filed 15 December 2025, following the set filed to 5 April 2024. Next accounts due 5 January 2027.
Check on Companies House, accounts filed
Confirmation statement
Made 25 April 2026
Filed 18 May 2026 with no updates. Next statement due 9 May 2027. Four statements on the register, one for every year the company has existed.
Check on Companies House, filing history

This panel proves the company. It does not prove the scheme registrations, the insurance or the cards, because none of those live on this register. Those are the five rows above, and they are still open. Ask for them in writing before you appoint anybody, us included.

REGISTER READ 09 SEP 2026 / COMPANY NO. 14482663

Which crew do you need?

Name the work and we will tell you who does it, when they are free, and what we would need from you to price it.